Mark Holdaway

mholdawa@nrao.edu
(520) 882-8250 x139


June 2005 work on the Y+ Configuration

Search for Fast Switching Phase Calibrators (PDF)

Does the ACA need phase calibration?

Global Warming and Chajnantor

Source Counts at 250 GHz

Fast switching paper 2004-1-23

Fast switching glish scripts 2003-12-15


Properties of the Y+ Configuration Set, Part I, 2003-09-05

Properties of the Y+ Configuration Set, Part II, 2003-09-05


Total Power Continuum: atmosphere and gain fluctuations, 2003-09-02

Total Power Simulation Software: low level classes 2003-09-03
Total Power Simulation Software: high level drivers 2003-09-03
Total Power Simulation Software: supermongo plotting routines 2003-09-03


Y+ Specifications Doc Submitted, 2003-07-01

Some Glish Scripts for ALMA Folks, 2003-07-02

Information

Last modified 3 Sep 2003
mholdawa@nrao.edu